How long will it take?
The average driveway takes two days to dig out , prepare the sub-base and set our levels and drainage.
It should take a day to lay itand it will be power washed off one - two days later.Approximately a week
later it will be sealed, so it will be out of action for around ten days for your car , although it will
be available for pedestrian traffic within that time.
What about the colour?
The colour comes in a powder form which contains various pigments and strengthening agents,
it is trowelled in to the wet surface to provide a permanent topping.
Will it crack?
Crack control joints are placed at regular intervals along the area to allow for expansion and contraction,
these are filled with a silicone and are barely visible when the area is sealed. The concrete also has a high
cement content and is re-inforced for additional strength.